Search Results
7/4/2025, 2:24:34 AM
Trenching 50' from the house to the solar shed. we have had live 240v split phase #4 AWG cable laying on top of the ground covered with FRP & ZIP board scraps for 12 months. barn construction has been held up for 2 months waiting for it.
after the trench is done, I mostly just want to relax. I may start framing the wall that has been on hold, waiting on the trench. once the wall is framed, i can start installing the roof panels. I already have the studs for the wall and the steel roof on site. my body is tired. I am not as young as I used to be.
after the trench is done, I mostly just want to relax. I may start framing the wall that has been on hold, waiting on the trench. once the wall is framed, i can start installing the roof panels. I already have the studs for the wall and the steel roof on site. my body is tired. I am not as young as I used to be.
Page 1