Search Results
7/7/2025, 7:37:34 AM
Another Zumwalt electric boongaloo going on
>US Navy warned that the program was running up to 36 months behind schedule.
>The Constellation-class frigate program is facing numerous delays and cost overruns. Even worse, no one seems to know the final design specifications for a ship that was supposed to enter service in less than a year’s time.
Welcome to the thirdie club, our frigate project was stuck in limbo due to issues with finalising design withe the French and cost ballooned.
>US Navy warned that the program was running up to 36 months behind schedule.
>The Constellation-class frigate program is facing numerous delays and cost overruns. Even worse, no one seems to know the final design specifications for a ship that was supposed to enter service in less than a year’s time.
Welcome to the thirdie club, our frigate project was stuck in limbo due to issues with finalising design withe the French and cost ballooned.
Page 1