Search Results

Found 1 results for "6875094c05ab054c64d818404738b2c7" across all boards searching md5.

Anonymous ID: H6AqSZXsCzech Republic /pol/511989588#511990038
8/2/2025, 12:48:28 AM
>>511989900
>An example of the required amount of forces and resources to carry out the work for urgent burial of the dead A.1 The number of forces and resources for carrying out work on the urgent burial of the dead is determined based on the condition of creating teams (groups) for the urgent burial of bodies of the NFGO for the burial of 1000 dead within 3 days from the moment of exposure to damaging factors arising during military conflicts or as a result of these conflicts, as well as sources of large-scale natural and man-made emergencies. A.2 In accordance with the main types of work on urgent burial of the dead, it was initially determined labor costs for the construction of a pit when digging a mass grave. Based on the requirements of the relevant documents, the dimensions of the mass grave are taken as follows: • 20 m — length at the bottom; • 3 m - width:- 2.3 m — height. The most efficient in terms of productivity when digging trenches is to use bulldozers, for example: which include bulldozers with a traction force of 10 to 15 tons, based on T-170 and T-130 tractors, which are widely used in the Russian Federation. A bulldozer with an average productivity of 80 m3 in excavation trenches is accepted as the design type of equipment.3/h. Taking into account the steepness of the slopes of 1:3, the length of the excavation pit at the top for the entry and exit of bulldozers will be 32 m. The creation of a reinforced soil layer with specified mechanical and physical properties is carried out using organomineral mixtures and active additives according to GOST 30491. Basic operations for the formation of a pit for a structure intended for emergency burial The characteristics of corpses are shown in Figures A.1–A.9.