Search Results
8/3/2025, 4:53:03 AM
>>512071326
>144,000 cubic yards of rock removed for I-17 widening plan alone.
We still do it, but most projects were when the USA was a developing country. The Sierra Nevada mountain range alone has 15 holes blasted when the transcontinental railroad was built. The Cascade Tunnel in the Cascade Mountain Range train tunnel is 7.8 miles long.
>144,000 cubic yards of rock removed for I-17 widening plan alone.
We still do it, but most projects were when the USA was a developing country. The Sierra Nevada mountain range alone has 15 holes blasted when the transcontinental railroad was built. The Cascade Tunnel in the Cascade Mountain Range train tunnel is 7.8 miles long.
Page 1