Search Results
6/26/2025, 4:12:56 AM
>>63896422
https://www.koreaittimes.com/news/articleView.html?idxno=132536
>Korea Aerospace Industries (KAI) announced on June 25th that it has signed its first mass production contract for the KF-21 Korean Fighter Jet with the Defense Acquisition Program Administration (DAPA).
>The contract includes the production of 20 KF-21 jets along with follow-up logistical support (technical manuals, training, etc.), amounting to a total of 1.96 trillion won.
>The KF-X project for the Korean Fighter Jet system development aims to replace the long-serving F-4 and F-5 aircraft of the Air Force with a 4.5-generation fighter that aligns with future battlefield operational concepts. The development process began in 2015.
>The total development period is slated to be 10 years and 6 months, with system development expected to be completed by 2026. Mass production deliveries are planned to commence at the end of 2026, with the goal of integrating the jets into the Korean Air Force’s operations.
https://www.koreaittimes.com/news/articleView.html?idxno=132536
>Korea Aerospace Industries (KAI) announced on June 25th that it has signed its first mass production contract for the KF-21 Korean Fighter Jet with the Defense Acquisition Program Administration (DAPA).
>The contract includes the production of 20 KF-21 jets along with follow-up logistical support (technical manuals, training, etc.), amounting to a total of 1.96 trillion won.
>The KF-X project for the Korean Fighter Jet system development aims to replace the long-serving F-4 and F-5 aircraft of the Air Force with a 4.5-generation fighter that aligns with future battlefield operational concepts. The development process began in 2015.
>The total development period is slated to be 10 years and 6 months, with system development expected to be completed by 2026. Mass production deliveries are planned to commence at the end of 2026, with the goal of integrating the jets into the Korean Air Force’s operations.
Page 1