Big oil built - I'll only need 2 of these (once they get upgraded to t3 modules) for 2.7k SPM.
I think I'm going to try and get both plastic and sulfur near enough to this that I can have the train trip be extremely short.
>>536590717
I only ever use 1-2 and 2-4, but in the past I've also used 1-1 (I remember doing it in IR3 because I had some real space constrained stations).
I always do this because it's a nightmare to retrofit, but it's quite easy to do right now. I've also had some things that I have both a 1-2 and 2-4 for (generally stuff like plates, where I can use a smaller train footprint if I need a much lower quantity).